Construction of a wooden prefabricated house: from start of assembly to the last stage.

Once the foundation is complete, prefabricated glued beams arrive at the site. Using cranes, the large packs of beams are carefully unloaded and stored, ready for assembly.

The construction team starts by assembling the load bearing walls. The beams are meticulously positioned one above the other and secured with unique special screws and dowels, forming the skeleton of the house. This stage highlights the precision and craftsmanship involved in working with glued beams.

Erection of walls

Photos illustrate step by step process of wall erection. Scroll through the gallery to see all stages of glulam log house construction.

Roof Installation

Window and Door Installation / Finishing Works

Important: The price of the home kit does not include costs associated with assembly work, roofing, windows and doors, electrical installation, plumbing, and foundation. All these elements must be additionally included in the budget and ordered separately to ensure full finishing and functionality of the house.

With our log home kits, you can also order high-quality windows and doors manufactured in Poland. The exact cost is calculated once the project is finalized and the actual window openings are determined.